Risk in projects

3 important questions on Risk in projects

What are the three important parts of risk management?

  1. Identifying potential sources of loss
  2. Measuring the financial consequences of a loss occurring
  3. Using controls to minimize actual losses or their financial consequences.

What is the equation of the FMEA?

Impact x probability x detection

Each of the dimensions have to be evaluated by the five point scale

For what kind of projects does the management uses CPM or PERT?

  • Critical Path Method is used for the most frequent duration and is used for standardized projects
  • Program Evaluation and Review Technique is used for projects with a high uncertainty and little experience in terms of personnel.

The question on the page originate from the summary of the following study material:

  • A unique study and practice tool
  • Never study anything twice again
  • Get the grades you hope for
  • 100% sure, 100% understanding
Remember faster, study better. Scientifically proven.
Trustpilot Logo