Random stuff

3 important questions on Random stuff

Name the tools in the Measure Phase

Lean measures, like:
Process Cycle Efficiency (PCE)
Overall Equipment Effectiveness (OEE)
Lead time
Takt time

What tools are can be found in Improve and Control phases?

Single Minute Exchange of Dies (SMED)
Kanban
One Piece Flow
5S
Error Proofing (Poka Yoke)
Standardized processes
Visual Management

What is most important in Lean what covers Define, Measure and Analyse phase?

Identifying waste or one of the 7 wastes.

The question on the page originate from the summary of the following study material:

  • A unique study and practice tool
  • Never study anything twice again
  • Get the grades you hope for
  • 100% sure, 100% understanding
Remember faster, study better. Scientifically proven.
Trustpilot Logo