Summary: Lean Sixsigma Greenbelt

Study material generic cover image
  • This + 400k other summaries
  • A unique study and practice tool
  • Never study anything twice again
  • Get the grades you hope for
  • 100% sure, 100% understanding
PLEASE KNOW!!! There are just 64 flashcards and notes available for this material. This summary might not be complete. Please search similar or other summaries.
Use this summary
Remember faster, study better. Scientifically proven.
Trustpilot Logo

Read the summary and the most important questions on Lean SixSigma greenbelt

  • 4 Week 4

  • 4.1 VOC/CTQ

    This is a preview. There are 20 more flashcards available for chapter 4.1
    Show more cards here

  • What is called waste, uselessness, non-value added


    Muda
  • Where is the W for in TIMWOODS

    Waiting
  • Where is the O for in TIMWOODS


    Over-Production
  • Where is the D for in TIMWOODS

    Defects
  • What is the takt time?


    The frequency the customer is asking the product in
  • What is a good method to help you get the oldest products out first

    FIFO (FIRST IN FIRST OUT)
  • Where does the theory of TOC says?

    Focus on the bottlenecks, the ones that slows your process
  • How are activities called that can be done when the machine is running?

    External activities
  • How can problems be visualized?


    When the WIP is minimized problems become visable
  • How is the method called for making products mistake proof?

    Poka Yoke
PLEASE KNOW!!! There are just 64 flashcards and notes available for this material. This summary might not be complete. Please search similar or other summaries.

To read further, please click:

Read the full summary
This summary +380.000 other summaries A unique study tool A rehearsal system for this summary Studycoaching with videos
  • Higher grades + faster learning
  • Never study anything twice
  • 100% sure, 100% understanding
Discover Study Smart

Topics related to Summary: Lean Sixsigma Greenbelt