Summary: Les 4 Bpim

Study material generic cover image
  • This + 400k other summaries
  • A unique study and practice tool
  • Never study anything twice again
  • Get the grades you hope for
  • 100% sure, 100% understanding
PLEASE KNOW!!! There are just 24 flashcards and notes available for this material. This summary might not be complete. Please search similar or other summaries.
Use this summary
Remember faster, study better. Scientifically proven.
Trustpilot Logo

Read the summary and the most important questions on Les 4 BPIM

  • 1 Quality

    This is a preview. There are 14 more flashcards available for chapter 1
    Show more cards here

  • What does PCDA stands for?

    Plan, DO, Act, Check
  • What is the relation between the six sigma and PDCA

    The Six Sigma provides the framework to apply during the "DO" phase of PDCA to ensure that process improvement goals are achieved.
  • Why is the Plan-do-Check-Act so important?

    Because this cycle is the foundation for sustainable improvement within a company
  • Is six sigma another quality tool?

    • Yes! if we consider quality of all processes acrooss the whole value chain of the company
    • Yess! If we are speaking of quality in terms of what our customers require
    • No! if by quality we mean only manufacturing quality.  
  • What are the tools to define a clearly Goal?

    Tools
    • Voice of the customer
    • Problem definition tree
    • SIPOC
    • Project charter
    • Change management 
  • What are the steps to measure the goal?

    • Map the present process
    • Determine primary metric and define it
    • Develop a measurement plan
    • Collect data
    • Determine baseline process capability    
  • What are the steps of the analyze phase?

    Identify potential causes
    reduce variables for measuring
    identify root causes
    test hypothesis to confirm root causes
  • What are the steps of the control phase?

    Implement permanent control methods
    Track improved long term performance
    Confirm process capability
    Standardize control plan
    clous out project
  • What is the essence of the control phase?

    The C phase is to ensure that there is no falling back from the improvements that has been attained/observed and that the changes you helped to make become an integram part of the way your organization operates.
  • WHoe are the actors? and what are their rolles?

    Problem owner = Central actor

    Their rol is to determine the perspective of the analysis, Influence what to change and they can make changes as well
PLEASE KNOW!!! There are just 24 flashcards and notes available for this material. This summary might not be complete. Please search similar or other summaries.

To read further, please click:

Read the full summary
This summary +380.000 other summaries A unique study tool A rehearsal system for this summary Studycoaching with videos
  • Higher grades + faster learning
  • Never study anything twice
  • 100% sure, 100% understanding
Discover Study Smart