Activity-based costing
9 important questions on Activity-based costing
Define cost smoothing, and explain how managers can determine whether it occurs with their costing system.
Why should managers worry about product over- or undercosting?
What is costing system refinement? Describe three guidelines for such refinement.
- Higher grades + faster learning
- Never study anything twice
- 100% sure, 100% understanding
What is an activity-based approach to designing a costing system?
'Increasing the number of indirect-cost pools is guaranteed to sizably increase the accuracy of product, service or customer costs.' Do you agree? Why?
What are the most frequently used allocation bases for manufacturing overhead costs?
Describe four levels of a manufacturing cost hierarchy.
'The existence of non-output-unit-level costs means that managers should not calculate unit product costs based on total manufacturing costs in all levels of the cost hierarchy.' Do you agree? Explain.
How is an activity-based approach different from a traditional approach to designing a jobcosting
The question on the page originate from the summary of the following study material:
- A unique study and practice tool
- Never study anything twice again
- Get the grades you hope for
- 100% sure, 100% understanding