Summary: Manufacturing
- This + 400k other summaries
- A unique study and practice tool
- Never study anything twice again
- Get the grades you hope for
- 100% sure, 100% understanding
Read the summary and the most important questions on Manufacturing
-
1 Manufacturing
This is a preview. There are 85 more flashcards available for chapter 1
Show more cards here -
Combo Run (runs)
The layout of many customer parts running together on a machine. -
Work Order(W/O)
Work to be done for a single production run. Used interchangeable with Combo Run. Correct terminology used when referencing the combo run in AS400. -
Combo Status report
A report generated by production indicating the status of the combo runs. -
Prototype Tooling/Tool
A mold used to form the plastic into the correct blister; normally made out of aluminum or porous material. -
Blind Shipment/Hidden Shipper
TCC is not shown as the company shipping the product (mainly used for brokers) -
Purchase Order (PO)
The order processed from the customer. -
PO # (Purchase Order Number)
The assigned customer's order #, indicated on the purchase order sent in. -
Annual Usage Quantity/Quote
A piece part price based on an agreed yearly amount that the customer is contracted to take. -
Blanket Order ("B") order
An order for an extended period time with specific dates in which a fraction of the order is to be shipped. -
Forecasted Order ("F order")
An order for an extended period time without specific dates of shipments, instead requiring a set stock quantity be kept at all times for customer yo pull parts from.
- Higher grades + faster learning
- Never study anything twice
- 100% sure, 100% understanding