Production Activity Control (PAC) + Advanced Scheduling
4 important questions on Production Activity Control (PAC) + Advanced Scheduling
What's the key element of an effective Production Activity Control (PAC)?
Describe elements of the framework of production activity control
- Release of individual orders and follow up activities are part of PAC
- Procurement is seen as a professional activity where information networks, relationships, term and conditions are established with vendor companies outside PAC, while release of individual orders and follow-up activities are part of PAC.
- Feedback signals: status information and warning signals
What's the effect of JIT on PAC?
- Capacity utilization is not a key issue.
- Higher grades + faster learning
- Never study anything twice
- 100% sure, 100% understanding
Production activity control techniques covers basic shop floor concepts. Which three approaches of shop-floor can you appoint?
2. Priority sequencing rules: for jobs at a work center under MRP
3. Theory of constraints scheduling: involved the preparation of an exact schedule of jobs for bottleneck work centers, and sequencing the non bottleneck work centers by a priority sequencing rule.
The question on the page originate from the summary of the following study material:
- A unique study and practice tool
- Never study anything twice again
- Get the grades you hope for
- 100% sure, 100% understanding