Tactical planning
3 important questions on Tactical planning
What are the characteristics of a time driven RCCP?
- Capacity is NOT fixed (irregular capacity available);
- Due dates are hard (deadlines)
- Objective to minimize use of irregular capacity
What does the red umlined constraint stand for? Give also an additional remark on this constraint.
Cannot be modelled in an ILP because in the condition of whether or not this constraint should hold values decision models are used.
What does Ukt stand for?
The question on the page originate from the summary of the following study material:
- A unique study and practice tool
- Never study anything twice again
- Get the grades you hope for
- 100% sure, 100% understanding