MPC - Workload Control

4 important questions on MPC - Workload Control

What does workload control focus on?

Capacity oriented planning system operating primarily as shop floor release mechanism.

What question does workload control focus on?

How can we be as productive as possible? Not how can we serve our customers as best as possible.

What is an advantage of Workload control?

Stable internal lead times (limited WIP, quality)
  • Higher grades + faster learning
  • Never study anything twice
  • 100% sure, 100% understanding
Discover Study Smart

What is a disadvantage of workload control?

Ignores external delay times (due date reliability)

The question on the page originate from the summary of the following study material:

  • A unique study and practice tool
  • Never study anything twice again
  • Get the grades you hope for
  • 100% sure, 100% understanding
Remember faster, study better. Scientifically proven.
Trustpilot Logo