The traffic light model (risk management):
- Red = intolerable --> stop the activity
- Yellow = tolerable --> reduce the risks over time
- Green = acceptable --> continue as normal
Risk management strives for efficient risk reduction. Sometimes you see a mismatch between the evaluation and the steps that are recommended (or taken) in response. — This can be caused by incompetence or by
politics.
In risk governance, who are the actors?
•Single actor --> Normal management
•Integrated and stable agent
•Internal power is high
•No actor/ Multiple actors -->Risk Governance
•Cooperative structure of agents (e.g., treaty, institution)
•Creates “organizational capacity” (IRGC 2005, 57)
•The consequences must be taken into account: expense, time, additional control mechanisms, possible loss of “balance of powers” or “regulatory capture”
integrative framework’s special descriptive
features of risk (from appraisal)
•Risks with high uncertainty after assessment should be handled in a participatory way, seeking stakeholder consensus on a best way forward. Resilience should be stressed.
•Risks with high ambiguity need to be dealt with at a higher level. This means going beyond mere stakeholder involvement, since we need a way of resolving stakeholder disagreement. Hence, civil society (general political decision-making) is brought in.
The question on the page originate from the summary of the following study material:
- A unique study and practice tool
- Never study anything twice again
- Get the grades you hope for
- 100% sure, 100% understanding